2 Production Β· 2 of 7

Feedstock Supply Model

Annual Supply Model (from Tool 1)

Loading...

1. Primary Feedstock Calculator Primary
  1. 1Annual Volume (Dry Tonnes)
    ?This value is pulled from Tool 1. It is the total dry tonnes of this feedstock available per year.
    →
    Starting Volume
    0 tonnes
  2. 2Ash Content (%)
    fCalculates: [Step 1 Volume] * (1 - Ash %)
    ? The non-organic, mineral content of feedstock. Ash content varies depending on feedstock type, contamination, and whether the biomass has been pretreated. A default value of 10% is used to represent mixed, non-pretreated coffee pulp and husk commonly available at origin. Users may adjust this value based on known feedstock composition and handling practices.
    →
    Dry Ash-Free Matter
    0 tonnes
  3. 3Biochar Yield (%)
    fCalculates: [Step 2 Matter] * Yield %
    ?The percentage of mass converted to biochar. 25% is a conservative estimate.
    →
    Total Biochar Produced
    0 tonnes
  4. 4Stable Carbon (%)
    fCalculates: [Step 3 Biochar] * Carbon %
    ?The percentage of the final biochar's mass that is stable carbon. 45% is a good starting point.
    →
    Total Stable Carbon
    0 tonnes
  5. 5Net Crediting Factor (calibrated)
    fCalculates: [Step 4 Carbon] * Factor
    ?This is a net crediting factor (not the 3.67 chemistry ratio). It is calibrated to practitioner outcomes. Default 2.29 corresponds to ~1.6 tCO2e per tonne of biochar at 70% stable carbon.
    =
    Total Claimable Credits
    0 tCO2e
Total Project Feedstock
0 tonnes

This volume determines your machine size below.

Technology Note:

Fine, low-density feedstocks (like coffee pulp/parchment) are not suitable for low-cost batch kilns (e.g., Flame Cap or Kon-Tiki). These materials require a continuous-feed pyrolyzer.

Kiln Selection & CAPEX

Total Feedstock
0 t/y
Volume per Hub
i Total Feedstock / Number of Hubs. This value determines the required kiln size.
0 t/y
Determined Size
--

Pyrolyzer Cost
$--
Shipping & Installation
$--
Total Upfront Pyrolyzer CAPEX
i (Pyrolyzer Cost) + (Shipping & Installation). This is a primary component of your project's CAPEX.
$--

Note Missing Info for Further Research